← Resources · November 16, 2026
Internal Security GS3 5 min read

First Tejas Mk1A Squadron by March 2027: Engine Delays, the Fighter Gap and India's Combat Jet Plans

What happened
01

The Chief of the Air Staff said the Indian Air Force (IAF) expects to form its first full squadron of Tejas Mk1A fighter jets by the end of March 2027 at the latest. An IAF fighter squadron usually has about 18 aircraft.

02

The IAF has ordered 180 Tejas Mk1A jets from Hindustan Aeronautics Limited (HAL) in two contracts: 83 jets in 2021 and 97 jets in September 2025 (worth Rs 62,370 crore, without taxes).

03

Deliveries of the first batch were supposed to start in February 2024 but are late. The main reason is the slow supply of F404-IN20 engines from the American company GE Aerospace. Fitting weapons and other systems also took extra time.

04

The IAF has only 29 active fighter squadrons against a sanctioned (officially approved) strength of 42. This is its lowest level in about 60 years.

05

The Tejas Mk2, a heavier and more powerful version with a GE F414 engine, has not flown yet; its rollout may happen next year. For the Advanced Medium Combat Aircraft (AMCA), India's stealth fighter, the process of choosing an industry partner to build prototypes is going on.

Static topic 1 of 3 · Internal Security

Light Combat Aircraft (LCA) Tejas: India's Indigenous Fighter

The Tejas is a small, single-engine fighter jet designed in India by the Aeronautical Development Agency (ADA) and built by Hindustan Aeronautics Limited (HAL). It has a triangle-shaped "delta" wing and can fight enemy planes in the air and also attack targets on the ground. The Tejas Mk1A is an improved version of the first Tejas (Mk1). It is called a "4.5-generation" fighter because it adds modern radar, missiles and electronic warfare systems to an older basic design.

Connection to this news

The Tejas Mk1A is meant to replace the old MiG-21s and other retiring jets. Because engine supplies from GE came late, HAL missed its 2024 start date. The IAF chief's March 2027 deadline for the first squadron shows how important this aircraft is to stop the fall in squadron numbers.

Static topic 2 of 3 · Internal Security

Advanced Medium Combat Aircraft (AMCA) Programme

The Advanced Medium Combat Aircraft (AMCA) is India's own fifth-generation stealth fighter now under development. Stealth means the jet is shaped and coated so that enemy radars find it very hard to detect. It is designed by the Aeronautical Development Agency (ADA) under DRDO and will have two engines. It is meant to be India's main advanced fighter for the coming decades, sitting above the Tejas in size and capability.

Connection to this news

The IAF chief said the process of selecting the company or consortium that will help build AMCA prototypes is underway. Together with the Tejas Mk1A and Mk2, the AMCA is part of India's long-term plan to fill the fighter gap with jets designed at home.

Static topic 3 of 3 · Internal Security

Kaveri Engine Programme

The Kaveri is a jet engine that India started developing in 1989 to power the Tejas. It is being developed by the Gas Turbine Research Establishment (GTRE), a DRDO laboratory in Bengaluru. Because the Kaveri could not produce enough thrust (pushing power) for the Tejas, India had to buy American GE engines instead. This is the root reason why today's Tejas production depends on supplies from abroad.

Connection to this news

The late arrival of GE's F404-IN20 engines is the main reason Tejas Mk1A deliveries slipped. This shows the risk of depending on one foreign supplier for a key part, and why India keeps investing in its own engines like the Kaveri.

Key facts & data
  • First Tejas Mk1A squadron expected: by end of March 2027 (at the latest)
  • One IAF fighter squadron: about 18 aircraft
  • IAF fighter squadrons: 29 active vs 42 sanctioned (lowest in about 60 years)
  • Total Tejas Mk1A ordered: 180 (83 in 2021 + 97 in September 2025)
  • Second order: 97 jets, Rs 62,370 crore (without taxes), signed 25 September 2025; deliveries over six years from around 2027-28
  • Original start of Mk1A deliveries: February 2024 (missed)
  • Mk1A engine: GE F404-IN20 (about 84 kN); 99 engines ordered in 2021; first delivered March 2025
  • Tejas Mk2 engine: GE F414 (about 98 kN)
  • Tejas designer: Aeronautical Development Agency (ADA); builder: Hindustan Aeronautics Limited (HAL)
  • AMCA Programme Execution Model approved: 27 May 2025 (open competition between public and private firms)
Read it? Now lock it in. The quiz for this day’s brief covers this story.
Take the quiz