Approved List of Models and Manufacturers (ALMM)
Updated 18 Nov 2026: Added the July 2026 relief: net-metering and open access projects need List-II cells only after 31 December 2026. Updated listed capacity.
The Approved List of Models and Manufacturers, or ALMM, is a government list of solar products and factories that India has checked and approved. It is run by the Ministry of New and Renewable Energy (MNRE). If a solar project is covered by the ALMM rules, it can only use solar panels (and now solar cells) that appear on this list.
You can think of it like an approved vendor list that a school keeps for uniforms: parents can buy only from the shops on that list.
Why does it exist?
A solar panel is expected to work for 25 years or more. A buyer cannot tell, just by looking, whether a panel will really give the power written on its label, or whether it will fail in five years. Many cheap imported panels in the past did not perform as promised. The ALMM solves this by letting only inspected factories and tested models into large and government-linked projects.
Over time, it also became a tool to grow solar manufacturing inside India, because listing needs a factory inspection and the list is made up almost entirely of Indian factories.
Where did it come from?
The MNRE issued the ALMM Order on 2 January 2019. It made registration compulsory for solar PV modules and cells used in covered projects. After some delays, the first ALMM list for modules was published on 10 March 2021. Here is how it changed over time:
- 2022: The rules were widened to cover open access and net-metering projects (both explained in Concepts to Know).
- March 2023: Because Indian factories could not yet meet all demand, the MNRE put the order in abeyance (temporarily paused it) for the financial year 2023-24. Projects commissioned up to 31 March 2024 were exempted.
- 1 April 2024: The pause ended and the ALMM came back into force, with no blanket exemptions.
- 9 December 2024: The MNRE announced that solar cells would also have to come from an approved list from 1 June 2026.
- March 2026: The MNRE extended the system to ingots and wafers, with compliance due from 1 June 2028.
- 18 July 2026: The MNRE gave a limited relief. Net-metering and open access projects commissioned (started running) on or before 31 December 2026 do not need List-II cells. They must still use List-I modules. There is no blanket extension for other projects.
The three lists
The ALMM now has three parts, one for each stage of the value chain:
- List-I: Solar PV modules. In force since 2021. From 1 June 2026, List-I keeps only modules made with List-II cells.
- List-II: Solar PV cells. The first List-II was published on 31 July 2025. Compliance became compulsory from 1 June 2026. Net-metering and open access projects commissioned on or before 31 December 2026 are exempt from the cell rule.
- List-III: Ingots and wafers. Announced in March 2026. From 1 June 2028, covered projects must use wafers from listed makers. A company that wants its wafers listed must also have matching ingot capacity.
So, step by step, India is asking: first, make the panel here; then, make the cell here; next, make the wafer and ingot here too. This is called backward integration (moving to the earlier stages of making a product).
How does a manufacturer get listed?
The process has a few clear steps:
- The model must first get a BIS certificate from the Bureau of Indian Standards, India's national standards body. Without it, no listing is possible.
- The maker applies to the ALMM cell at the National Institute of Solar Energy (NISE), which works under the MNRE.
- A team from the MNRE or an authorised agency inspects the factory to check that it really exists and has the claimed capacity.
- The model is then added to the list. Under the reforms of May 2023, a listing is valid for 4 years (earlier it was 2 years) and can be renewed. The same reforms cut the application fee by 80%.
The listing stays valid only as long as the BIS registration stays valid. The MNRE also sets minimum efficiency levels (efficiency means how much of the sunlight falling on a panel is turned into electricity). Under the 2023 rules, modules for grid-scale power plants needed at least 20% efficiency, rooftop and solar-pump modules 19.5%, and solar-lighting modules 19%.
Which projects must follow it?
The ALMM covers:
- Projects set up by or supported by the central or state governments, including schemes such as PM-KUSUM (solar pumps for farmers) and rooftop solar programmes
- Projects that sell power to government power-buying agencies
- Net-metering projects and open access projects (since 2022)
Captive "behind-the-meter" plants, where a factory puts panels on its own premises only for its own use, have been kept outside the rules.
India's position and related tools
The ALMM is one of several tools India uses together to build its solar industry:
- Basic Customs Duty (BCD): A tax on imported solar cells and modules, in force since 1 April 2022. It began at 40% on modules and 25% on cells. In Budget 2025-26 the BCD was cut to 20% on both, but an extra cess (the Agriculture Infrastructure and Development Cess) was added, so the total import tax stayed roughly the same.
- Production Linked Incentive (PLI) scheme for high-efficiency solar modules: cash rewards for factories that produce more in India.
- Domestic Content Requirement (DCR): Some subsidy schemes, such as PM-KUSUM, rooftop solar under PM Surya Ghar: Muft Bijli Yojana and the CPSU Scheme, demand that both cells and modules be made in India.
As of late 2026, India's module capacity (about 233 GW a year) is far ahead of its cell capacity (about 30 GW) and its ingot and wafer capacity (about 2 GW). On the ALMM itself, as of September 2026, List-I covered about 228 GW of module capacity, while List-II covered only about 37 GW of cell capacity. This gap is the reason the ALMM deadlines for cells and wafers are being watched so closely.
Commonly confused concepts
- ALMM vs DCR: ALMM says the product must be on an approved list. DCR says the product must be made in India. Today List-II is almost entirely Indian cell makers, so the two overlap in practice, but legally they are different rules applied to different sets of projects.
- ALMM vs BIS certification: BIS certification checks that a product meets a quality standard. ALMM goes further: it also inspects the factory and lists the manufacturer. BIS certification is a condition for getting on the ALMM.
- ALMM vs PLI: ALMM is a rule (a "stick") about what buyers may use. PLI is a reward (a "carrot") paid to manufacturers for producing more.
- ALMM (solar) vs ALMM (Wind): Wind turbines have their own list. It began in 2018 as the RLMM (Revised List of Models and Manufacturers) and was renamed ALMM (Wind) in July 2025.
Issues, criticism and the way forward
- Supply gap and higher prices: When a deadline arrives before enough Indian capacity exists, listed products become scarce and costly. This can raise the cost of solar power and slow down new projects. This is why the order was paused in 2023-24.
- Dependence on imported machines: Indian factories still rely on Chinese equipment and engineers, especially for ingots and wafers. China's proposed technology export curbs make the 2028 wafer deadline harder to meet.
- Trade concerns: Trading partners sometimes see such lists as a hidden barrier to imports. The government's position is that the ALMM is mainly a quality and reliability measure.
- Way forward: Experts suggest building more Indian research and engineering skills, partnering with equipment makers in countries such as Germany, Japan and South Korea, and keeping deadlines linked to real capacity on the ground.
Concepts to Know
- Net metering: A system in which a home or office with rooftop solar panels sends extra electricity to the grid and gets credit for it on its electricity bill. The meter runs "both ways".
- Open access: A system that lets a big electricity user (usually using 100 kW or more) buy power directly from a generator of its choice, such as a solar park, instead of only from the local power distribution company.
- Abeyance: A temporary pause. A rule in abeyance still exists on paper but is not applied for some time.
- Backward integration: When an industry moves to make the earlier inputs of its product itself. For solar, it means moving from making modules to making cells, then wafers, ingots and polysilicon.
- Gigawatt (GW): A unit of power. 1 GW = 1,000 megawatts. For factories, "10 GW of capacity" means the factory can make enough panels each year to produce 10 GW of power.
- Cess: An extra tax charged for a specific purpose, on top of the main tax.
- ALMM Order issued by the MNRE on 2 January 2019; first module list (List-I) published 10 March 2021
- Extended to open access and net-metering projects in 2022
- Held in abeyance for FY 2023-24; restored from 1 April 2024
- List-I = modules; List-II = cells (compulsory from 1 June 2026; first list published 31 July 2025; net-metering and open access projects exempt till 31 December 2026); List-III = ingots and wafers (compulsory from 1 June 2028)
- Listing needs BIS certification plus factory inspection; applications go to NISE
- Listing valid for 4 years (since the May 2023 reforms; earlier 2 years); application fee cut by 80%
- Minimum module efficiency (2023 rules): 20% utility-scale, 19.5% rooftop and pumps, 19% lighting
- Basic Customs Duty on cells and modules since 1 April 2022; restructured in Budget 2025-26 to 20% BCD plus AIDC
- 18 Nov 2026Added the July 2026 relief: net-metering and open access projects need List-II cells only after 31 December 2026. Updated listed capacity.