← Resources · November 08, 2026
Polity & Governance GS1GS2GS3 5 min read

Mekedatu Project: Karnataka Seeks Tamil Nadu's Cooperation on the Cauvery Reservoir

What happened
01

The Karnataka government asked Tamil Nadu to cooperate on the proposed Mekedatu balancing reservoir on the river Cauvery, near Kanakapura in Karnataka. It said the project would help Tamil Nadu more than Karnataka.

02

This came after the Tamil Nadu government wrote to the Prime Minister opposing the project. Tamil Nadu fears the dam will reduce the water that reaches its farmers.

03

Karnataka's position is that the project is mainly for Bengaluru's drinking water and will not let it take extra water for other uses. It also has a pumped-storage power component of 400 MW (megawatts).

04

About 5,400 hectares of forest land would go under water. Karnataka says it has arranged alternative land elsewhere as compensation.

05

Karnataka pointed to the Supreme Court's November 2025 decision, which rejected Tamil Nadu's challenge as premature. It said the Centre's role is now mainly about environment and forest clearances, and that it will keep releasing 177.25 TMC (thousand million cubic feet) of water to Tamil Nadu as the Supreme Court has ordered.

06

Karnataka invited Tamil Nadu's representatives to visit and inspect the project site.

Static topic 1 of 3 · Polity & Governance

Mekedatu Balancing Reservoir-cum-Drinking Water Project

The Mekedatu project is a large dam and reservoir that Karnataka plans to build on the Cauvery river at Mekedatu, in Kanakapura taluk, just before the river enters Tamil Nadu. A "balancing reservoir" is a reservoir that stores water and releases it in a controlled way, so that supply stays steady through the year. Karnataka says its main purpose is drinking water for Bengaluru and the generation of electricity. Tamil Nadu, the downstream state, opposes it because it fears less water will flow to its delta farmers.

Connection to this news

The latest exchange between the two state governments is the next step after the Supreme Court sent the project back to the expert bodies. Karnataka is preparing its applications for forest and environment clearances, while Tamil Nadu is pressing the Centre to stop it.

Static topic 2 of 3 · Polity & Governance

Cauvery Water Dispute and the Cauvery Water Management Authority

The Cauvery Water Dispute is a long fight between Karnataka and Tamil Nadu, with Kerala and Puducherry also involved, over how to share the water of the Cauvery. Karnataka is the upstream state, where the river starts and much of its water is collected. Tamil Nadu is downstream, where the river feeds the large paddy fields of the Cauvery delta. The dispute was settled in law by a tribunal award in 2007, changed by the Supreme Court in 2018, and is now managed by a permanent body.

Connection to this news

Tamil Nadu fears that a big new storage dam just above the border will let Karnataka control how and when water reaches Biligundlu. Karnataka's reply is that it will keep releasing the 177.25 TMC fixed by the Supreme Court, and that the reservoir could even help steady the flow to Tamil Nadu in lean months.

Static topic 3 of 3 · Polity & Governance

Pumped Storage Hydropower

Pumped storage hydropower is a way to store electricity using water and two reservoirs at different heights. When there is extra electricity in the grid, for example at noon when solar plants produce a lot, the plant uses it to pump water up to the upper reservoir. When demand is high, for example in the evening, the water flows back down through turbines and makes electricity again. You can think of it as a giant water battery.

Connection to this news

Mekedatu is not only a water project. Karnataka plans a pumped-storage component of about 400 MW, which would store surplus power and supply it at peak times. This power angle is part of why Karnataka argues the project has value beyond irrigation.

Key facts & data
  • Mekedatu: on the Cauvery near Kanakapura, Karnataka, about 2 km upstream of the Cauvery-Arkavathi confluence
  • Power component: about 400 MW (pumped storage)
  • Forest land to be submerged: about 5,400 hectares, as stated by Karnataka
  • Supreme Court dismissed Tamil Nadu's plea as premature: 13 November 2025
  • Cauvery: Karnataka must release 177.25 TMC a year to Tamil Nadu at Biligundlu (Supreme Court, 16 February 2018)
  • Karnataka's share after 2018: 284.75 TMC (up 14.75 TMC from the 2007 tribunal award of 270 TMC)
  • CWMA set up on 1 June 2018; CWRC monitors flows
  • India's pumped storage: about 7 GW operating (December 2025); CEA target over 100 GW by 2035-36
Read it? Now lock it in. The quiz for this day’s brief covers this story.