GE Ships Four More F404 Engines for Tejas Mk1A: Why Engine Delays Are Holding Back India's Fighter Plans
On 7 October 2026, US company GE Aerospace announced that it had shipped four F404-IN20 engines to Hindustan Aeronautics Limited (HAL) in September 2026 for the Tejas Light Combat Aircraft (LCA) Mk1A.
With this shipment, GE has sent seven F404-IN20 engines in the last two months. HAL had received 10 engines before this shipment, out of 99 engines GE must deliver under a 2021 contract.
At least 25 Tejas airframes (the body of the aircraft, without engines) are ready, and HAL is waiting for engines. Delays in engine supply have in turn delayed aircraft deliveries to the Indian Air Force (IAF).
In February 2021, the Ministry of Defence signed a Rs 48,000 crore contract with HAL for 83 Tejas Mk1A jets (73 fighters and 10 trainers), to be delivered within eight years. As of this news, HAL has not delivered a single Mk1A to the IAF.
The Chief of the Air Staff recently said the delay is hurting the IAF because its number of fighter squadrons is falling. The Ministry of Defence has called for realistic project timelines, warning that delays raise costs and the risk of technology becoming outdated.
Read the rest free
This story is in the Current Affairs course
A free account opens half of every day’s news, the daily quiz and your Vault.
Every story and every concept in full, organised for revision.