PM E-DRIVE is a Government of India scheme that helps people buy electric vehicles and helps build the charging network they need. Its full name is PM Electric Drive Revolution in Innovative Vehicle Enhancement. It is run by the Ministry of Heavy Industries. It gives a discount on electric two-wheelers, three-wheelers, ambulances and trucks, money for electric buses, money for public charging stations, and money to upgrade vehicle testing centres. It replaced the earlier FAME scheme.
Why does it exist?
Petrol and diesel vehicles cause two big problems for India. First, they pollute the air in our cities. Second, India imports most of its crude oil, so every litre of fuel burnt sends money out of the country. Electric vehicles produce no exhaust smoke on the road. But in the early years they cost more than petrol vehicles, mainly because batteries are costly.
The scheme gives a discount to close this price gap, so that more people buy EVs. Once more EVs are sold, companies make them in bigger numbers and costs fall. That is when the subsidy can slowly stop.
Where did it come from?
India's EV support has grown in stages:
- National Electric Mobility Mission Plan (NEMMP) 2020: launched in 2013. It was a roadmap for promoting electric and hybrid vehicles.
- FAME India Phase I: FAME stands for Faster Adoption and Manufacturing of (Hybrid and) Electric Vehicles. Phase I started on 1 April 2015 and ran until 31 March 2019, with an outlay of about ₹895 crore.
- FAME India Phase II: ran for five years from 1 April 2019 to 31 March 2024. Its outlay was ₹10,000 crore, later raised to ₹11,500 crore. It supported e-two-wheelers, e-three-wheelers, e-buses and charging stations.
- Electric Mobility Promotion Scheme (EMPS) 2024: a short bridge scheme from April to September 2024, so that support did not stop after FAME II ended. It was later merged into PM E-DRIVE.
- PM E-DRIVE: approved by the Union Cabinet on 11 September 2024 and notified on 29 September 2024, with an outlay of ₹10,900 crore for two years. Because EMPS was merged into it, the scheme period is counted from 1 April 2024.
- Extension: the scheme was extended to 31 March 2028. In August 2026, the outlay was raised by ₹1,000 crore to ₹11,900 crore, mainly to keep supporting electric two-wheelers.
How does the discount reach the buyer?
The scheme uses an e-voucher system.
- A buyer chooses an eligible EV from a registered company.
- The dealer's system creates an e-voucher for that buyer, linked to the buyer's identity, after verification.
- The buyer signs the e-voucher and gets the discount upfront, at the time of purchase. The price is lower right at the showroom.
- The dealer uploads the signed voucher and a selfie of the buyer with the vehicle.
- The vehicle company (called the OEM, the original equipment manufacturer) then claims the subsidy amount back from the Ministry.
This makes sure the money reaches a real buyer and that one vehicle is not claimed twice.
How is the subsidy calculated?
For electric two-wheelers and three-wheelers, the discount is linked to battery size, measured in kWh (kilowatt-hour, a unit that tells how much energy a battery can store).
- Electric two-wheelers: ₹5,000 per kWh with a cap of ₹10,000 per vehicle in 2024-25. From 1 April 2025, it was halved to ₹2,500 per kWh, with a cap of ₹5,000 per vehicle.
- Only e-two-wheelers with an ex-factory price of up to ₹1.5 lakh are eligible.
- The discount can never be more than 15% of the ex-factory price of the e-two-wheeler or e-three-wheeler, whichever is lower.
- The subsidy is designed to fall over time, so the market slowly stands on its own.
- The support for e-three-wheelers of the L5 category (the bigger auto-rickshaws and goods carriers) reached its target and closed on 26 December 2025.
The key parts and facts
As per the scheme's official portal (after the August 2026 revision), its main parts are:
- Demand incentives (discounts on purchase): ₹4,674 crore for e-two-wheelers, e-three-wheelers, e-ambulances, e-trucks and other new EVs. In the original 2024 plan, this part was ₹3,679 crore, aimed at about 24.79 lakh e-two-wheelers and 3.16 lakh e-three-wheelers.
- E-buses: ₹4,391 crore for 14,028 e-buses, run by state transport undertakings and public transport agencies in big cities.
- E-ambulances: ₹500 crore. This was the first time the government gave EV support for ambulances.
- E-trucks: ₹500 crore. This was also a first. To get the incentive, the buyer must scrap an old truck.
- Public charging stations: ₹2,000 crore. The original plan was about 72,300 chargers: 22,100 fast chargers for e-cars, 1,800 fast chargers for e-buses and 48,400 fast chargers for e-two- and three-wheelers.
- Testing agencies: ₹780 crore to upgrade the centres that test and certify vehicles, so they can test new EV technology.
Make in India rule
Only vehicles that meet the Phased Manufacturing Programme (PMP) rules get the subsidy. PMP means companies must make more and more of the vehicle's parts in India over time, instead of importing them. This makes sure the subsidy builds factories and jobs in India, not abroad.
India's position and Indian examples
As of June 2026, about 26.59 lakh EVs had been sold with PM E-DRIVE support, as per the government, and the figure later crossed 30 lakh. Electric two-wheelers and three-wheelers make up most of these sales. PM E-DRIVE works alongside other EV policies:
- PLI scheme for Advanced Chemistry Cell (ACC) batteries: ₹18,100 crore to build battery factories in India.
- PLI scheme for Automobiles and Auto Components: rewards companies for making advanced vehicles and parts, including EVs, in India.
- PM-eBus Sewa-Payment Security Mechanism (PSM): approved along with PM E-DRIVE in September 2024, with ₹3,435.33 crore, to protect bus operators if a public transport authority fails to pay. It aims to support more than 38,000 e-buses.
- GST: EVs are taxed at only 5% GST, much lower than petrol and diesel cars.
Commonly confused concepts
- FAME vs PM E-DRIVE: FAME (I and II) ran from 2015 to March 2024. PM E-DRIVE is the next scheme. Unlike FAME II, PM E-DRIVE gives no subsidy for private electric cars, but it adds e-ambulances, e-trucks and testing agencies.
- PM E-DRIVE vs PM-eBus Sewa: PM E-DRIVE gives money for e-buses, chargers and vehicle discounts. PM-eBus Sewa (launched 2023) is a separate scheme mainly for city buses in smaller cities. Its PSM part guarantees payments to bus operators.
- PM E-DRIVE vs PLI-ACC: PM E-DRIVE helps the buyer (demand side). PLI-ACC helps the battery maker (supply side).
- Ministry of Heavy Industries vs Ministry of Power: PM E-DRIVE is run by the Ministry of Heavy Industries. The technical rules for building and running charging stations are made by the Ministry of Power.
- kW vs kWh: kW is power (how fast energy flows). kWh is energy (how much is stored). The subsidy is per kWh of battery.
Issues, criticism and the way forward
- Charging gap: EV sales have grown faster than public chargers. Reports in 2026 said chargers sanctioned under the scheme were slow to be actually installed.
- Subsidy dependence: Sales sometimes jump just before a subsidy cut and then slow down. Critics say the industry should not depend on subsidies for too long.
- Misuse in the past: Under FAME II, some companies were found to have claimed subsidies without meeting local manufacturing rules. The e-voucher and stricter checks are meant to stop this.
- Fund limits: The scheme is "fund-limited". If the money for any part runs out early, that part can close, which creates uncertainty for buyers.
- Clean grid: An EV is only as clean as the electricity used to charge it. With a lot of coal in India's power mix, the full benefit comes only as more renewable power is added.
- Way forward: Experts suggest faster rollout of chargers, battery swapping for two- and three-wheelers, local battery production, and a gradual exit from subsidies.
Concepts to Know
- Electric vehicle (EV): A vehicle that runs on electricity stored in a battery, using an electric motor instead of a petrol or diesel engine.
- Subsidy / demand incentive: Money the government pays to lower the price a buyer pays, to encourage people to buy something.
- Ex-factory price: The price of the vehicle when it leaves the factory, before dealer margin, registration and insurance are added.
- OEM (Original Equipment Manufacturer): The company that makes the vehicle, such as a scooter or bus maker.
- Outlay: The total money set aside for a scheme.
- Fund-limited scheme: A scheme that stops giving money once the set amount is used up, even if the end date has not come.
- Full name: PM Electric Drive Revolution in Innovative Vehicle Enhancement; Ministry of Heavy Industries
- Cabinet approval: 11 September 2024; notified: 29 September 2024; period counted from 1 April 2024
- Original outlay: ₹10,900 crore (two years); raised to ₹11,900 crore in August 2026; extended to 31 March 2028
- Replaced FAME II (April 2019 to March 2024, ₹11,500 crore); EMPS 2024 merged into it
- E-buses: ₹4,391 crore for 14,028 buses; e-ambulances ₹500 crore; e-trucks ₹500 crore; charging ₹2,000 crore; testing agencies ₹780 crore
- E-two-wheeler incentive from 1 April 2025: ₹2,500 per kWh, cap ₹5,000; only up to ₹1.5 lakh ex-factory; never more than 15% of ex-factory price
- Discount given upfront through an e-voucher
- No subsidy for private electric cars
● Tracked since November 20, 2026 · last seen November 20, 2026 · updates as the daily brief publishes